See if you can guess what’s in the picture below.

It’s my files on our six year battle to get Kingborough Council to approve the installation of our Royal Commission recommended, Victorian Building Authority accredited, Resilience Australia award winning, CSIRO researched, National Construction Code compliant personal bushfire shelter, installed at our home on 100 acres of north facing dense forest up a narrow dead end road with overhanging trees down to the channel in Huon – the largest population at the highest risk of bushfire in Australia.

The shelter was eventually approved by Council in 2025, as installed in 2019 except for the stone access steps being replaced with a ramp, so we can wheel someone up to the door of the shelter and tip them down the stairs. And the distance from the door to the fire prone vegetation was reduced from 16m to 11.25m – avoiding the need to remove a hay bale of dry leaves, grasses, twigs and other fine fuels for which Council would not give us permission. No other vegetation needed to be removed for which we did not have planning permission from 2008.

But even after the shelter was approved Council did not stop chasing us. The next two photos show how obsessed they became.

Here is an ‘enforcement letter’ from Kingborough dated 16 July 2025 – four weeks after the shelter was approved – claiming we removed trees for which we did not have planning approval. The circled passage reads ‘This statement is incorrect. The permit for DA-2008-665/A did not provide for the removal of all trees located within the 25m Building Protection Zone.’

And here is the relevant part of the planning approval we had from DA-2008-665/A. The key passage from (6)(b)  reads ‘However, approval is granted for the removal of all trees that are located within the 25m radius Building Protection Zone.’

The enforcement letter was clearly false. With my background and resources I could track that down. How many other ratepayers in Kingborough have had to accept Council’s false claims? At what cost? Isn’t this something you’d expect Council to want to investigate? Especially since I did a forensic 78 page analysis of all the documents providing Council with a textbook example of maladministration, and well documented allegations of serious misconduct and illegality by at least one Council employee. Did they take it up?

It turns out their answer was ‘No. Nothing to see here. Go away’.  So, as I informed Council when I sent them my analysis, if they don’t think there is anything to learn from this train-wreck – after the Summerleas Road and the Kingston Bus Interchange fiascos – I would send it to the Integrity Commission for them to investigate.

I did that yesterday.

And I also asked the Integrity Commission to investigate Council’s out of the blue offer/demand we received on 17 March for $10,000 for my wife to pay part of their costs in prosecuting us for refusing to remove the shelter before we got it approved. How long before 17 March 2026 did Council decide to pursue us for money they were owed from 4 July 2024?  Had they been meaning to demand payment for the last 15 months and just eventually got around to it? Is Council always that slow to ask for money it’s owed? If so, no wonder they had to hike rates by 6.5% this year – and are still forecasting a deficit of $2.5m.

Or did someone in Council decide that my public criticisms of Kingborough as a candidate for Huon were a threat, and it would be better if my campaign funds were reduced by $10,000 to make it much harder for me to stand?

I have no idea which of these is true, but I think the Integrity Commission must investigate. Because the Electoral Act says (among other things) at Section 187 on Electoral Bribery that a person must not for an improper purpose ask for or receive any property or benefit with the intention of influencing whether or not a person nominates as a candidate or withdraws their nomination. If anyone in Council decided now was the time to take $10,000 from our savings, having waited 15 months to do so, mindful that this would make it less likely that I would continue as a candidate, that would appear to be a serious criminal offence. I have asked the Integrity Commission to get to the bottom of that.

As you might imagine I am thoroughly sick of this whole business, but I am determined to pursue it to the end. Malpractice, misconduct and even corruption in organisations are like weeds in a garden. If you are not looking for them and pulling them out they are growing. One of the important roles of members of the Legislative Council is to be alert to and intolerant of the merest whiff of corruption. That is a role I am well prepared for and willing to play.